VB-G RAM G Bill 2025 Explained: What Is the New Rural Job Guarantee Law and How Is It Different from MGNREGA?
The central government is preparing for a major shift in India’s rural employment framework. After nearly two decades of implementation of MGNREGA, the government is planning to introduce a new law called the Viksit Bharat Guarantee for Employment and Livelihood Mission (Rural) Bill 2025, commonly referred to as the VB-G RAM G Bill. This proposed legislation aims to redefine rural job guarantees by aligning them with the long-term vision of Viksit Bharat 2047.
The government has clarified that this is not just a change in name, but a structural and conceptual overhaul intended to make rural employment more productive, transparent, and future-ready.
What Is VB-G RAM G Bill 2025?
The VB-G RAM G Bill 2025 is a proposed rural employment guarantee law that seeks to replace MGNREGA. Under this new framework, the government plans to provide a legal guarantee of 125 days of wage-based employment to every rural household that is willing to work.
Unlike the earlier focus on short-term and scattered works, the new law emphasizes long-lasting, asset-creating projects. The objective is to ensure that rural employment not only provides income support but also contributes to building durable infrastructure and sustainable livelihoods in villages.
In simple terms, VB-G RAM G combines employment generation with rural development in a more structured and outcome-oriented manner.
Priority Areas Under the New Rural Employment Mission
Under the proposed law, rural works will be clearly divided into four priority categories to ensure better planning and effective use of public funds:
-
Water Security Projects
This includes construction and revival of ponds, water conservation systems, irrigation facilities, and groundwater recharge projects. -
Core Rural Infrastructure
Works such as rural roads, connectivity projects, and basic public infrastructure will receive focused attention. -
Livelihood-Linked Assets
Infrastructure related to storage facilities, rural markets, processing units, and production-linked structures will be developed to support income beyond agriculture. -
Climate and Disaster Resilience Works
Projects aimed at protecting villages from floods, droughts, soil erosion, and climate-related risks will be prioritized.
All these works will be integrated into a national digital system, making monitoring, planning, and transparency significantly stronger.
How Is VB-G RAM G Different from MGNREGA?
The most visible difference is the increase in guaranteed workdays from 100 to 125 days. However, the changes go much deeper.
Under MGNREGA, works were often fragmented and not always linked to long-term development goals. In contrast, the new law mandates planned and goal-oriented projects. Each village will prepare its own Viksit Gram Panchayat Plan, which will be aligned with national infrastructure and development programs.
This approach is expected to improve accountability, reduce duplication of work, and ensure that public money creates lasting value for rural communities.
How Will VB-G RAM G Strengthen the Rural Economy?
The new law aims to go beyond employment and boost the entire rural economy. Water conservation will directly benefit agriculture, while improved roads and connectivity will make market access easier. Livelihood-linked infrastructure will open non-farm income opportunities, reducing overdependence on agriculture.
As more income flows into villages, local consumption is expected to rise, helping small businesses and reducing rural-to-urban migration.
Importantly, the scheme takes agricultural seasons into account. State governments will be allowed to pause government works during sowing and harvesting periods so that farmers can easily find labor when needed. This will help control sudden wage spikes and keep farming costs in check.
Benefits for Rural Workers
For rural workers, VB-G RAM G promises several direct benefits:
-
25% increase in guaranteed employment days
-
Better advance planning, so workers know when and where work will be available
-
Fully digital wage payments, reducing delays and leakages
-
Mandatory unemployment allowance if work is not provided on time
These provisions are designed to offer greater income stability and dignity to rural laborers.
Why Replace MGNREGA?
According to the government, rural India has changed significantly since 2005. Poverty levels have declined, digital payments have become widespread, and new livelihood opportunities have emerged. The old MGNREGA framework no longer fully reflects these realities.
Government audits have also flagged issues such as fake job entries, misuse of funds, bypassing digital attendance, and machine-led work being falsely shown as manual labor. In 2024–25 alone, irregularities worth around ₹193 crore were reportedly detected. Additionally, only a small percentage of households were able to complete the full 100 days of work.
How Will Transparency Improve Under the New Law?
The VB-G RAM G Bill proposes extensive use of technology. AI-based systems will help detect fraud, while GPS tracking and mobile monitoring will be used to supervise worksites. Each panchayat will undergo mandatory social audits twice a year, and all work and expenditure details will be made publicly available.
The scheme will remain centrally sponsored, with costs shared in a 60:40 ratio between the Centre and states. Northeastern and hilly states will receive higher central assistance, ensuring that states are not overburdened.
In summary, the VB-G RAM G Bill 2025 represents a significant transformation of India’s rural job guarantee system. By combining employment security with infrastructure creation, digital transparency, and long-term planning, the government aims to create a stronger and more self-reliant rural economy aligned with the vision of a developed India by 2047.

